Construction crews are tending to a few hiccups as Georgia Power prepares for Unit 3’s fuel load. Fuel assembly deliveries have been paused in order to repair a leak that has developed in the spent fuel pool of Plant Vogtle’s Unit 3. The spent fuel pool is located in the unit’s auxiliary building, a separate location from the containment vessel […]